Looking to buy, sell or rent a boat slip?Secure contact form
Waterfronte Villas & Yacht Club
Carolina Beach, North Carolina

Waterfronte Villas & Yacht Club Boat Slips

A private Carolina Beach marina offering protected wet slips, brand-new floating docks and a premier location just beyond Snow's Cut Bridge, moments from the inlet, Wrightsville Beach and the Cape Fear River.

Waterfronte Villas & Yacht Club
60ft+
Slips sized for sportfish, cruisers & sailboats.
Overview

A premier marina in the heart of Carolina Beach.

Waterfronte Villas & Yacht Club is a private, gated community in Carolina Beach offering protected wet slips, immaculate floating docks installed new in 2025 and a relaxed, resort-style setting along the Intracoastal Waterway.

Located just beyond Snow’s Cut Bridge, the marina provides excellent access to Masonboro Inlet, the Cape Fear River, Wrightsville Beach, Southport and the regional waters that make this stretch of coast among the most desirable in the Carolinas.

View available slips

Why boaters choose Waterfronte Villas.

Prime location

Minutes from the inlet, the river and downtown Carolina Beach.

Fast inlet access

Direct Intracoastal frontage with quick runs to open water.

Protected harbor

A sheltered basin that keeps wakes and storm surge to a minimum.

Private community

A gated, resort-style yacht club with controlled, secure entry.

Resort lifestyle

Pool, walkways and amenities steps from your slip.

Waterfronte Villas & Yacht Club
Marina specifications

Waterfronte Villas slip sizes & dock specifications.

Check current availability →

Marina and dock facts for Waterfronte Villas & Yacht Club, Carolina Beach, NC.

Everything at Waterfronte Villas.

  • ✓Wet slips, Up to 60′+
  • ✓T-heads & ends, Up to 65′
  • ✓Lift compatible, Up to 40′
  • ✓Wide-beam slips, To 14′6″ beam
  • ✓New 2025 floating docks
  • ✓30 / 50 amp power
  • ✓Fresh water
  • ✓Community pool
  • ✓Restrooms & showers
  • ✓Parking
  • ✓Gated entry

Power, water and dock facilities differ between docks and individual slips. We confirm exactly what applies to a slip before you tour it.

Getting there

Just beyond Snow's Cut Bridge.

By water

On the point at Myrtle Grove Sound and Snow's Cut, across from the inlet and the Intracoastal at mile 295. Reaches the ICW and the Atlantic without a no-wake zone in between, and Masonboro Inlet, Wrightsville Beach and the Cape Fear River are all a short run.

By road

Address100 Spencer-Farlow Drive, Carolina Beach, NC 28428
Recently sold

Slips we have sold at Waterfronte Villas.

All sold slips →
36′ Boat Slip, Waterfronte Villas and Yacht Club
Sold
Waterfronte Villas & Yacht Club, Carolina Beach

36′ Boat Slip, Waterfronte Villas and Yacht Club

Wet SlipBeam 14.5′June 2026
36′ Boat Slip, Waterfronte Villas and Yacht Club
Sold
Waterfronte Villas & Yacht Club, Carolina Beach

36′ Boat Slip, Waterfronte Villas and Yacht Club

Wet SlipJune 2026
30′ Boat Slip, Waterfronte VIllas and Yacht Club
Sold
Waterfronte Villas & Yacht Club, Carolina Beach

30′ Boat Slip, Waterfronte VIllas and Yacht Club

Wet SlipBeam 14.5′June 2026
Before you buy

What owning a slip at Waterfronte Villas involves.

Deeded slips at Waterfronte Villas can be owned outright, rented for income, or held as a 1031 exchange property. Demand along this stretch of the Intracoastal stays strong and inventory rarely lasts.
Talk to an advisor

Questions about slips at Waterfronte Villas.

The ones we are asked most often. Anything that varies from dock to dock, or slip to slip, we confirm before you tour.

Are slips individually owned?
Yes. Select slips at Waterfronte Villas are deeded and individually owned, which means you can buy, sell, lease, or hold a slip as an investment.
What size boats can the slips accommodate?
Slips accommodate vessels from compact center-consoles up to 60 ft and beyond, with premium T-head and end-tie positions for larger yachts.
Are the docks new?
Yes, the marina installed brand-new floating docks throughout 2025, adding stability, convenience and security.
Can I live aboard my boat?
Liveaboard policies vary by marina and season. We're happy to walk you through current rules and availability, just reach out.
How secure is the marina?
Waterfronte Villas is a private, gated community with controlled entry, giving owners added peace of mind for their vessels.
Let us connect

Tour Waterfronte Villas.

By appointment, we will respond promptly.

    What are you looking for?


    We are here to help

    We would love to hear from you.

    Whether you are weighing a purchase, an investment, or a season at the dock, we will share current availability and arrange a private tour of Waterfronte Villas & Yacht Club.

    Marina
    Waterfronte Villas & Yacht Club, Carolina Beach, NC
    Call or text
    Will Moss
    Hours
    Monday to Saturday, 9:00 AM to 5:00 PM, by appointment